process optimization
Process Optimization 18% vs Manual Margins Job Shop Wins
In a 200-unit grooving run, overhead fell from $3.75 to $3.06 per part, an 18% reduction achieved by a five-layer continuous improvement program. When I first walked the shop floor, I saw operators toggling between paper checklists and manual data logs, a process that added minutes of idle